A summary of the performance of the Specialized Marine Holding concerning marine construction and structure development
Designing, supplying the construction materials, and establishing the port of Pars Petrochemicals as the greatest petrochemical port in western Asia.
Designing, supplying the construction materials, and establishing the Shahid Rajaee Port, i.e. phase 1, phase 2, the first section of phase 3, as the greatest and the most important commercial port in the country.
Designing, supplying the construction materials, and establishing the Tonbak service and export port (Asaluyeh), as the largest caisson port in western Asia.
Designing, supplying the construction materials, and establishing phase 1 of Shahid Beheshti Port, i.e. Chabahar, as the largest Oceanport in the country.
Designing, supplying the construction materials, establishing, and financing the phase of commissioning Parsian port, as the largest minerals industry import and export port in the country.
Designing, supplying the construction materials, and establishing the oil waft of Shahid Rajaee port as the specific oil terminal of the Persian Gulf Star Oil Company (PGSOC).
Carrying out the project of establishing the mechanized sulfur export warehouses in the country as the first and the largest mechanized sulfur export warehouses in Iran pertaining to the project of the Tonbak service and export port and Pars service port.
Designing, supplying the construction materials, and executing the greatest industrial reservoirs in the southern coastline of the country such as Damavand and Kavian petrochemical pools.
Designing, supplying the construction materials, and establishing special marine structures such as Bandar-e Abbas Hoz Khoshk and Persian Gulf bridge.
Designing, supplying the construction materials, and establishing the largest artificial island next to Kish island.
Equipping the Specialized Marine Holding with the most tremendous dredging fleet of the region consisting of 6 cutter suction dredgers and one Harper dredger, with the dredging potential of dredging up to the depth of 30 m and transferring the dredged materials up to 10 km.
1. Port Protection Structure Section (Breakwater)
• Designing, supplying the construction materials and executing more than 118 km of various types of breakwaters, dikes, and coastal protection with a volume of 52 m3 of stone materials at the maximum depth of 39 m from the sea level.
2. Floating Docks Section (Waft)
• Designing, supplying the construction materials and executing more than 69 posts of disparate types of wafts with different use including container, multi-purpose, oil export, gas, sulfur, LPG & LNG, etc. With a cumulative length of more than 15 km in the marine projects.
3. Dredging Section
• Designing, supplying the equipment, and executing more than 63 million m3 of dredging operations at the sea bed, and land extraction in the marine projects.
4. Port Land Extraction and Improvement Division
• Extracting land from the sea using the dredging materials in the Iranian ports, in an area of 500 hectares.
• Designing, supplying the construction materials, and executing more than 288 hectares of land improvement and pavement of the port terminals.
5. Pool
• Designing, supplying the construction materials, and establishing the largest industrial pools in the southern coastline of the country prioritizing the special economic region, i.e. Energy Pars (Asaluyeh) with a capacity of a cumulative impounding capacity of 350,000 m3/h.
6. Executive Volumes
• Designing, supplying the construction materials, and installing more than 52 m3 stone material bearing disparate weights in the body of the breakwater, dike, and coastal protection.
• Designing, supplying the construction materials, and executing more than 325 km of pile driving of various metal and concrete piles in the marine projects.
• Designing, supplying the construction materials, and executing more than 139 km of drilling of various bored piles in the marine projects.
• Designing, supplying the construction materials, and executing more than 250,000 tonnes of metal operations and reinforcement in the marine projects.
• Designing, supplying the construction materials, and executing approximately 4,750,000 m3 of various types of reinforced and non-reinforced pre-constructed and bored concretes in marine projects.
7. Installing heavy structures, and the first and only heavy-lift engineering company in the country, operating in the field of installing heavy and semi-heavy equipment with proficiency:
• Petroleum, Gas and Petrochemicals Industry
• Power Plants and Nuclear Sites
• Wind Farm and Solar Power Station
• Infrastructures and Substructure Projects
• Shipbuilding Industry
• Fossil Fuel Power Plant
• Marine and Offshore Industry